I am trying to populate two fields (BeginM and EndM) with the begin and end measures from route features. Does anyone have any tips on how this can be done? Note - I don't want Min and Max M's blindly placed in BeginM and EndM respectively, as the measures may run the opposite way of the linear feature.
Thanks for any help you can give!
Matt Koukol