Hello,
I have a line fc with a field named PROGRESS. This field has a domain assigned with 3 possible values; In Progress, Completed and Not started.
I can symbolize based on the values of the field but I would like to be able to add a sum of the Shape_Length for all of the different values to the TOC and in the end have the lengths show up in the legend.
Is this possible?
In Progress: 450
Completed: 3000
Not Started: 6500
Something to that effect
Thank you,
James