Hello everyone,
What are your workflows for tracking inspections within the Utility Network? I'm trying to create a map to be used in Field Maps to track Hydrant Painting. Right now, I have a "Hydrant Painting" table related to our Water UN. In the related table, I have a dropdown to select Painting Phase. Ideally, I would like to symbolize off of Painting Phase, so the field crews can keep track of their progress. However, since we cannot symbolize off of a related table, I'm stumped on how the field crews can use this app to track progress. To further this, I don't want the inspections written directly to the UN because of all the different types of inspections we conduct. I don't want the attribute table getting overloaded, so a related tables seems like the best way to stay organized. I just can't figure out how to visualize status for the project. We are running Utility Network in Enterprise 11.5.
Any thoughts or suggestions would be greatly appreciated! Thank you.