Hello, I'm trying to dilineate watersheds as accurately as possible for a compost facility. There are two basins on site which I've chosen as my pour points for the watershed analysis. I orginally went the route of using the spatial analyst watershed tool after getting a DEM, filling it, getting flow then accumulation, and then running the tool with the pour points. I changed the distance for my pour points to see if anything would change, but the outputs wound up the same, as can be seen in the first image. It essentially just shows the area of the basins, which I guess could be seen as a good thing, as we want the drainage for this site to be contained. However, when I use the ready to use watershed tool, there is quite a big difference in output. Which should I trust more? Why are these outputs so different? I'm essentially trying to see what area is draining into these basins, and if drainage is contained to this site. Thank you for any input!
Spatial Analyst Watershed with Pour Points
Ready to Use Watershed with Pour Points
Read to Use Watershed with Flow Accumulation Shown