Hello, needing some help on how to go about a requirement for the team I created the UN for. We started from scratch and digitized a circuit/feeder map as accurately as we could to represent the connectivity between devices/structures.
Now, our team would like us to create a much more accurate representation of our underground conduit and the configurations within manholes/vaults and the number of runs of conduit.
In order to represent this to our team, what should I rely on? Associating the circuits to the conduits? Separate views for conduit vs circuits in ExB? Not too sure how to go about this, we have a goal to use this for both reference and operations so accuracy is important to the team. How have those of you who utilize the UN for field operations gone about this?
Thank you!