I am currently building our Water Utility Network and working with the Blow-Off features within our infrastructure. Trying to determine the best path for connectivity.
Presently, I have the Blow-Off feature within Water Devices - Flushing and Blow Off. However, the connection from a water line - service (Blow-Off) isn't connecting.
Is there a different connection I am not aware of OR do I need to update the connectivity rules to allow that to happen?
Appreciate the feedback.