Hello all,
I'm new to the Geometric network stuff and am curious if any one has any documentation regarding when to split/not split the line work in a Wastewater Network? I saw a post regarding pipes in a water network (which I assume is about the same), but I wanted to double check first. Also, I was curious if it is possible to create a connectivity rule to auto-place a Service Connection at the start node of a lateral line? I have a rule that will auto-place a tap when the lateral connects to the main, but I'm looking for place the service connection at the beginning as well.
Thanks in advance,
Jeff