Hello all,
I am using ArcGIS Pro 2.8, and I'm having trouble with spatial joins between two point layers of 40K records each. I ran the first spatial join and had 127 records with join count 0. These 127 points were in the incorrect spot, so I moved them to their correct location. Then I ran the spatial join again, using the same parameters and tolerances. This time there are 15K records with join count 0. Does anyone have any suggestions?