How can I calculate the difference, in days, between a date on a hosted feature layer and a date on a related table record?
I have a report point, that captures information about a repair that needs to be made, and a related table that captures information about the repairs that were made. I'd like to be able to use arcade to determine how many days lapsed between the point being added and the point being repaired.