I am currently configuring the Captial Project Planning solution to manage our CIP. One of the major issues we are running into is how to handle projects that are funded from multiple sources or have funding in multiple years.
For example, we have a bridge project where the design phase will take place next year(2022) and draw funds from MFT and Stormwater. The actual construction of the bridge will take place in 2024 and also draw from both funds. It would be nice to keep this all as one project but we can probably separate design and construction into two projects. I am not sure how to show that each project will have two funding sources.
Has anyone mapped out their projects with multiple funds or years? Is there a way to translate that into the review dashboard and apps?