We manage two different LRS Networks in R&H using ArcGIS 10.8.1. Every route in network 1 has a corresponding route in network 2. Simply put, there are two main differences between the networks. Network 1 has all of the event data associated with it. Second, the Route Identifier (RouteID) in network 1 does not contain a dash (-), but the RouteID in network 2 does.
The highlighted records in the pictured Edit Log table show examples of where the edit was performed to a route in network 2, but the NetworkId field returns a value for network 1. This only occurs on some, but not all, Cartographic Realign activities (ActivityCode = 12).
We do not maintain any critical services using this field, but the behavior is not expected. I was wondering if anyone else had noticed similar behaviors.
