Add an offset field and calculate it to 12 or -12 (experiment) and make the summary table a new line event table with the offset field option set. The lines will follow the road between the two point measures with a 12 ft offset.
This will offset the line forward or back 12 feet along the road, not left or right, correct? I believe the OP wants a sidewalk line, at least that's what I was picturing.
I am trying to create a vegetation management layer that is offset the road centerline on both sides but is interrupted by no spray areas along that line. I am trying to figure out how to have the offset lines be symbolized with one color for spray zone and a different color for no spray zones. I sounds like I can offset the centerline how you described above but would I need to break each offset line at the milepost where the no spray zone is for it to symbolize correctly? My other thought was just offset the centerline at 10, -10 and offset the no spray zones at 8, -8. I am hoping this all makes sense?
Angemeldete Mitglieder können Beiträge verfassen, Updates folgen und mehr. Neu hier? Registriere ein kostenloses Konto.
Find useful guides, FAQs, and documents to help you navigate and make the most of Esri Community.