I realize this is probably a dumb question, but that's never stopped me before, so here we go. I have set up versioning to allow for two editors to make updates to the parcel layer simultaneously. That works great. However, once I've reconciled and posted both versions to default, that still leaves both editors looking at two different versions of the data. Is there a way to trigger the editor versions to be updated with the default version once it is posted or is my only option to delete and recreate the versions?