Hi there,
I'm just wondering can the 'Apply Asset Package' gp tool be run multiple times on the same UtilityNetwork that was staged within the enterprise geodatabase?
Trying to determine the workflow as I develop up my asset package configurations (eg. extend Asset Groups, add new Asset Type and their associated coded domains, new attribute rules with db sequences, etc).
Not sure if the enterprise geodatabase has to be rebuilt and the 'Stage Utility Network' gp tool run every time the apply asset package when new configurations are added. I assumed the rebuild steps would have to be done when the Asset Groups are changed (eg removed) as this system is designed as an 'additive' approach.
Thanks for your time with this