I was hoping to get recommended best practices for service points within a panel as we prepare to migrate our data from the GN to the UN
We currently have a mixture of service point modeling on our larger developments where some service points (meters) within a low voltage panel are daisy chained together with a single conductor running between each meter. Some meters are modeled as point-to-point, with the conductor beginning at the panel and terminating with the meter.
Does the UN support both models or is there a specific model that is recommended?