I installed the log4j patch for ArcGIS Server and DataStore and it only took about 5 minutes.
Now I'm installing the log4j patch for Portal on a different Windows server and its been running for about 45 minutes. Could this be due to too few resources on the Windows Server as my org reduced the CPU to 2 processors and RAM to 8 GB?