Please see the attached picture re the fields in question.
Are the data points? or a polyline? or do you only have the data in a table
Hi Dan, The fibre loop is a data point. So the AsBuiltLength represents the difference between begin and endmeasure. I want to add an algorithm to the AsBuiltLength field: AsBuiltLength = endmeasure -beginmeasure [or vice versa]. This will save a bit of time. Cheers, Sean
I take it you aren't using arcmap which would be a simple field calculation, so perhaps you might want to elaborate on which part of the 'Developer' forest you are in. You can Share to a more directed space if you want (access to the top right of your question)
Thanks, I'll return to the question on Monday.
Hi Dan, I am using ArcMap. I'm definitely in a forest, so I can't elaborate too much. Would you have any recommendations for sharing/tags?
Sean, if your data is in a relational database, a trigger could calculate the AsBuiltLength on an update to the endmeasure and beginmeasure fields (obviously checking that both are populated)..
Přihlášení členové mohou přispívat, sledovat aktualizace a další. Jste tu noví? Zaregistrujte si bezplatný účet.
Find useful guides, FAQs, and documents to help you navigate and make the most of Esri Community.