Environment:
ArcGIS Desktop 10.5.1 with Network Analysis Extension
Case 1:
Add 3 stops and get the shortest path.

Case 2:
Copy the first stop and make it as last stop (sequence = 4)

The results shows that the start point of route geometry is not begin at 1st stop in Case 2.
Why and how to make the result route geometry start at 1st stop location?