I am having issues with data stored in a date field in a table used in Field Maps published via ArcGIS Online. I have manually edited the data to reflect the correct date for the records stored in the table (it should be 7/2/2025) and every time I go back to check on the data, it shows up as something else such as 7/3/2025 or 7/1/2025. Anyone else experiencing this issue and what is the resolution?