I have been trying to correct network errors on a pilot Utility Network model of my university's electric distribution network. Lately I am creating more errors than I started with. I think the main issue is terminal configurations on switches. I think my network would probably work best with terminals only at the substation circuit breakers and distribution transformers. Switches in between should only open or close to electricity traveling in either direction. Is there a way to remove the terminals from the switches?