I am running a geodesic viewshed analysis on a raster file / DSM that roughly represents a 9x3 nautical mile corridor. This raster file is a result of converting my LAS dataset into a raster file using the "LAS Dataset to Raster" Geoprocessing tool. With the geodesic viewshed tool, I've set the observer location within this corridor, and entered other specific values for the observer parameters (surface offset, observer offset, outer radius, etc.). Once ran, the progress bar is showing 14% complete, but this is after 2 hours and 9 minutes. At this pace, the geodesic viewshed will complete in 14 hours. Is this a realistic performance for the tool given the raster input? I'm hoping to repeat this process for other observation locations, but I would rather not have to wait another 14 hours.