Good evening.
I am curious if manhole feature classes should be mapped to the Structure Junction FC, the Sewer Device FC, or both. I know the ESRI AP ships with an attribute rule that creates a manhole channel (device) at the location of each new manhole (structure junction) on insert. However, during the data loading process, I don't believe that rule was executed. It took quite a bit of time to copy every structure junction into the sewer device feature class, and then wait for that rule to execute for over 6000 manholes.
So, my question is: what is the best practice for the UN Wastewater Model? Should Manholes only be mapped to Structure Junction? Is it best practice to load certain attributes from manholes into Sewer Device, and other attributes (pertaining to the cover itself) into the structure FC? I have worked with some clients that prefer the connectivity without the association, and others do not care one way or the other.
Just curious how you guys have been approaching this. It has been difficult finding good documentation for this.
Thanks!