Here is a step-by-step Tutorial for creating a simple Web App using the ArcGIS Online version of the Experience Builder.

You can view this Tutorial in HTML format.

 

http://davidapps.net/exb/EXBTutorial

 

You may download the entire Tutorial as a single PDF File.

 

http://davidapps.net/exb/EXBTutorial.pdf

 

You will be using the following widgets.

 

  • Map Widget
  • List Widget
  • Survey Widget
  • Widget Controller
  • Table Widget
  • Search Widget
  • Query Widget

 

Here is a preview of the Web App you will be creating:

 

https://experience.arcgis.com/experience/eace3c015bed4ddfbaf20f61a3ddbffe/

 

DAVIDDAS_0-1645138539565.png

 

 

If you want to add Custom Widgets, you will need to use the Developer Edition of the Experience Builder.

You can view this Tutorial in HTML format.

 

http://davidapps.net/exb/EXBDevTutorial

 

You may download the entire Tutorial as a single PDF File.

 

http://davidapps.net/exb/EXBDevTutorial.pdf

 

You will learn how to add the following Custom Widgets designed by Robert Scheitlin.

 

  • Print Widget
  • Enhanced Locate Widget
  • Measure Widget
  • Draw Widget

 

Here is a preview:

 

Note: You must use Firefox to open this.

 

http://davidapps.net/exb/ParcelMapV2

 

DAVIDDAS_1-1645138539581.jpeg

 

Best regards,

David Das

 

 

 

 

 

 

20 Replies
DavidDas__GISP
Occasional Contributor II

Hi John,

 

Congratulations!!

 

I am very happy to hear you got the Query Widget to work.

 

How about using the Filter Widget to filter out the data exactly they way you want it.

 

DavidDas__GISP_0-1645646306064.png

 

 

The Filter Widget will allow you to show only the Transmission Power Lines that carry 115kV.

 

You could turn on another Filter that will show only the Parcels of size >= 40 acres.

 

So, with these two filters engaged, your map will only display the Transmission Lines that are carrying 115kV and the Parcels that are 40 acres or larger in size.

0 Kudos