Select to view content in your preferred language

Update: Fixed an issue where Power Automate failed to create date passed as epoch value

294
0
02-26-2025 07:55 AM
AkshayHarshe
Esri Contributor
3 0 294

We are pleased to announce that we have fixed issue BUG-000174431 where Power Automate was throwing an error code 1000 with the message "Conversion failed when converting date and/or time from character string."

Power Automate is now resolved and should be available in production. This fix affects the following actions:

  • Create a record in a feature layer
  • Update a record in a feature layer

Even though the input field is text, the epoch entered should be without quotes, e.g., 1740433032729. Other text inputs are possible in the format of MM/DD/YYYY, etc. For specifications, please refer to the Add Features  and Feature Object. When the input date is not in the epoch time, it is recommended to use the "Convert date and time format" action.

Thank you for your patience and understanding

Contributors
About the Author
I am a GIS professional working with ESRI since 2013. I have a passion for location-enabled services how it is important in today's analytics of the data-driven world. I am privileged to work as a Product Engineer on the ArcGIS Insights team where I get to materialize my passion and build a product that is driven by cutting-edge technology in this industry. When I am not doing GIS you will mostly find me taking photos and talking about photography.