I know this is probably pretty basic, but i'm a student and can't get it right. I'm looking at this chart with several boxes and i'm supposed to estimate the cheapest costs and paths. I've looked at the examples but can't get it to come out right. All I need is a little nudge in the right direction so I know what i'm doing.
Thanks. 