Hi,
I want to code the piechart since the options in Chart properties are limited.
Is this possible with basic license and how do you do that?
Piechart:
One column is categorized in groups and per group the sum of the column Shape_length is used.
I want to change the order of the labels based on my preference, but thats not possible. The only options are to do it alphabetically or numerical. I just want to use the phases of my project as order.