Hi Folks,
I am working with Electric Utility Network downloaded from ArcGIS Solutions (Electric Utility Network Expanded) and then created UN out of it in file geodatabase
I am trying to run a downstream trace operation on tier Electric Distribution Primary, however, while choosing the starting point ( a valid device with a subnetwork controller) and running the trace gives error 001981: one or more starting points outside tier. The same issue was encountered with the Electric secondary tier as well
I am a newbie trying to figure out how to work with the UN. Performing this operation is an urgent project requirement.
Would be great if someone could tell me and let me know how to choose or prerequisites for choosing starting points for tiers while running trace.
Any kind of insights will be highly appreciated.
Regards,
Abigail