Using ArcGIS Pro 2.9 as a contract with the client
Our client has distribution (MV and LV) networks, Transmission, and Generation networks. But for the issue of distribution in MV networks and Transmission networks.... circuit length read perfectly. The problem come when I created LV for customers). Our LV traditional network has service lines to customer meters AND transformer distribution lines from HRC Fuses. But because HRC Fuse has not existed as Assettype and subnetwork controller, we have decided to replace HRC Fuse with LV Network protector ...to be able to create a subnetwork controller ). And we have added a defined subtype at low voltage conductor assetgroup called Service line overhead and underground.
In Tanzania Electrical network Infrastructure at the LV level
MV transformer (11kv or 33kv to 440V)----HRC Fuse--Transformer distribution line - Service lines----Customer meters
Arcgis network ((in the Secondary Mesh Tier)
MV transformer (XFR low) connects with Network protector (replace HRC Fuse)-----LV conductor Ac overhead(replace Transformer distribution line)------Service lines overhead (Service lines)- lv services (Customer meters.