AnsweredAssumed Answered

ArcGIS Pro Network Analyst Route layer: traffic data and time window?

Question asked by kawouters on Oct 23, 2019
Latest reply on Oct 24, 2019 by MMorang-esristaff

Hi,

I have created a route network in ArcGIS Pro which contains historical traffic data and from this I made a route layer. Now I would like to calculate the TravelTime for several routes. My routes are all different and have different start times.

I imported the orgins and destinations as Stops with Add locations and did the field mappings for the TimeWindowStart and TimeWindowEnd to be able to take this into account when calculating the routes. In addition I also configured the Time Properties for the Stops (and the Route as well) for this time window. In the Network Analyst toolbar there is also a tab about Arrive/Depart Time. Which option should I choose here so that the start time of the routes is according to my time window and that it also takes the traffic data into account? I tested them all and nothing seems to work. Might it be that there is something wrong with other settings of my route layer?

Thanks in advance!

Katrien

Outcomes