AnsweredAssumed Answered

temporal dimension (z) arcscene

Question asked by elterrell2 on Oct 18, 2019
Latest reply on Oct 30, 2019 by elterrell2

I have a csv file of points/times which I uploaded to ArcMap, converted to a line, and saved as a shapefile.  I brought it into ArcScene to 3D map it but I can only see the line.  Nothing else.  The TA has suggested that I didn't specify temporal dimension (Z) when converting csv file to point feature layer. Also the need to convert the time into seconds or hours before doing that.  Can anyone help with how to do this?  This is as far as I could progress.

Attachments

Outcomes