AnsweredAssumed Answered

Set Control Point at Intersect tool doesn't change anything

Question asked by Earth2 on Oct 23, 2018

The Set Control Point at Intersect tool in ArcGIS Pro doesn't seem to be working the way I think it's supposed to.  I'm using dashed line symbology to show the land stewardship boundaries in Nevada, and as I understand it this tool is supposed to draw the dashes in phase with one another so that the lines don't appear to overlap.

 

However, I've run the relevant features through the tool and it doesn't seem to be changing anything.  Note in the screenshot I've posted how the boundary between the Arc Dome Wilderness and Toiyabe National Forest appears almost as a solid line.  I made sure to export the feature to a geodatabase before running the tool (I notice it says the tool doesn't create control points on shapefiles).

 

Let me know if I need to post more information.

Attachments

Outcomes