water shed tool producing an unnaturally huge catchment

875
7
04-02-2018 11:27 PM
ps1
by
New Contributor

While using the watershed tool i am getting unnaturally huge catchment area. can it be a fault of the DEM i am using ( got from USGS-earth data website). Any suggestions please?

0 Kudos
7 Replies
DanPatterson_Retired
MVP Emeritus

you should outline the steps that you used to prepare the dem for use in delineating a watershed.  There are several issues that can cause strange outputs, not the least of which is the coordinate system used and the units of x, y and z.  Outline what you have done and perhaps show an image of what you obtained versus what you expect so that 'large' can be assessed

0 Kudos
ps1
by
New Contributor

Thanks Dan for your response. I followed the following steps: Fill-Flow Dir-Flow Acc-Con( Value>500) - Stream Order-Stream to feature-Snap Pour Point( the distance didnt mattter if i used 5 or 500), Watershed( used processing extent as that of my DEM). I used wgs1984 projection throughout. i have added some pictures to clarify my

problem. the actual watershed as obtained from a paper toposheet is very small as compared to what was obtained from the watershed tool in arcmap.

flow accDEM

0 Kudos
DanPatterson_Retired
MVP Emeritus

your coordinates are in decimal degrees and your elevation is in meters.  you would be advised to use projected data.. wgs84 is not a projection, but a datum

ps1
by
New Contributor

i am not an expert in these matters but i see what you are saying, because the cell size (x,y) is 0.00027777778, 0.00027777778 which cant be in meters. Can you please specifically advise me on how to get this right. I tried projecting it to Mercator,  but then it got completely lost from the base map.

0 Kudos
curtvprice
MVP Esteemed Contributor

If your Project operation was successful, the basemap should draw correctly. Did you use the Project Raster tool? Having the raster data properly projected must happen before you start (with the Fill step).

0 Kudos
curtvprice
MVP Esteemed Contributor

Note, I'm pretty sure I know what happened. Your SnapPour gave a tolerance to snap your pour point to the largest value with 5 <units>. Those units were 5 degrees, which is 300 nautical miles, so your point snapped to the highest flow accumulation cell in the raster.

VictoriaAnderson1
New Contributor II

I just recently delineated my own watershed using a DEM as well. I was looking at your steps and compared them to my own. My steps are as follows: Fill -> Flow Direction -> Flow Accumulation -> Con -> Stream Order -> Stream to Feature -> Basin -> Raster to Polygon -> (Created my pour point and placed in the raster cell(s) from the FlowAccumulation layer) ->Snap Pour Point -> and then Watershed. Hope this helps! I have step by step directions if you want them as well for how I did it.