AnsweredAssumed Answered

Network analysts - assign different costs after certain no. of stops

Question asked by GISUK_at_RWE on Oct 24, 2016

Hi there,

 

I am using the VRP solving from Network Analyst for optimized planning of cable routes.

Therefore it is required to assign different costs as exampled below. I have e.g. 6 routes:

  • Depot to first stop: 998$/m
  • First stop to second stop: 998$m
  • 2nd to 3rd:650$/m
  • 3rd to 4th: 650$/m 
  • 4th to 5th: 250$/m

I can't assign those costs to the network edges, as they are dynamically.

Is there a way to assign these costs dynamically to the Routes Layer or someway else in a way that the VRP considers these costs dynamically?

Or could you point me to another solution of this problem?

 

Thanks and kind regards

 

Felix

Outcomes