<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:rdf="http://www.w3.org/1999/02/22-rdf-syntax-ns#" xmlns:taxo="http://purl.org/rss/1.0/modules/taxonomy/" version="2.0">
  <channel>
    <title>topic NEED HELP TO DESIGN CONNECTION AT THE GRID SUBSTATION -TIERS  AT THE ELECTRICAL DOMAIN in Electric Questions</title>
    <link>https://community.esri.com/t5/electric-questions/need-help-to-design-connection-at-the-grid/m-p/1305660#M863</link>
    <description>&lt;P&gt;Look attached document for more understanding. I have an incoming HV line Mufindi grid substation to the Mbeya Grid substation&amp;nbsp;&lt;STRONG&gt;(Transmission tier)&lt;/STRONG&gt;. HV signal/connection travel to HV transformer (220KV/33KV) at the terminal of XFR-High. I created a &lt;STRONG&gt;Sub-transmission tier &lt;/STRONG&gt;at the XFR-Low that ends with an MV circuit breaker at the Bus terminal. I made a &lt;STRONG&gt;Distribution tier&lt;/STRONG&gt; at the MV Circuit breaker at the CB Line terminal.&lt;/P&gt;&lt;P&gt;My doubt about the Sub-transmission tier. And at what condition sub-transmission tier is used?&lt;/P&gt;</description>
    <pubDate>Wed, 05 Jul 2023 07:34:30 GMT</pubDate>
    <dc:creator>RomuldKiobya</dc:creator>
    <dc:date>2023-07-05T07:34:30Z</dc:date>
    <item>
      <title>NEED HELP TO DESIGN CONNECTION AT THE GRID SUBSTATION -TIERS  AT THE ELECTRICAL DOMAIN</title>
      <link>https://community.esri.com/t5/electric-questions/need-help-to-design-connection-at-the-grid/m-p/1305660#M863</link>
      <description>&lt;P&gt;Look attached document for more understanding. I have an incoming HV line Mufindi grid substation to the Mbeya Grid substation&amp;nbsp;&lt;STRONG&gt;(Transmission tier)&lt;/STRONG&gt;. HV signal/connection travel to HV transformer (220KV/33KV) at the terminal of XFR-High. I created a &lt;STRONG&gt;Sub-transmission tier &lt;/STRONG&gt;at the XFR-Low that ends with an MV circuit breaker at the Bus terminal. I made a &lt;STRONG&gt;Distribution tier&lt;/STRONG&gt; at the MV Circuit breaker at the CB Line terminal.&lt;/P&gt;&lt;P&gt;My doubt about the Sub-transmission tier. And at what condition sub-transmission tier is used?&lt;/P&gt;</description>
      <pubDate>Wed, 05 Jul 2023 07:34:30 GMT</pubDate>
      <guid>https://community.esri.com/t5/electric-questions/need-help-to-design-connection-at-the-grid/m-p/1305660#M863</guid>
      <dc:creator>RomuldKiobya</dc:creator>
      <dc:date>2023-07-05T07:34:30Z</dc:date>
    </item>
    <item>
      <title>Re: NEED HELP TO DESIGN CONNECTION AT THE GRID SUBSTATION -TIERS  AT THE ELECTRICAL DOMAIN</title>
      <link>https://community.esri.com/t5/electric-questions/need-help-to-design-connection-at-the-grid/m-p/1305689#M864</link>
      <description>&lt;P&gt;In this case you would not need the subtransmission tier.&amp;nbsp; Subtranmission is just like transmission, just a lower voltage, so subtransmission runs between stations, just like transmission.&amp;nbsp; I think you are trying to build a tier inside the substation for the equipment between the transformer and the breakers, is that correct?&lt;/P&gt;</description>
      <pubDate>Wed, 05 Jul 2023 10:14:03 GMT</pubDate>
      <guid>https://community.esri.com/t5/electric-questions/need-help-to-design-connection-at-the-grid/m-p/1305689#M864</guid>
      <dc:creator>JohnAlsup</dc:creator>
      <dc:date>2023-07-05T10:14:03Z</dc:date>
    </item>
    <item>
      <title>Re: NEED HELP TO DESIGN CONNECTION AT THE GRID SUBSTATION -TIERS  AT THE ELECTRICAL DOMAIN</title>
      <link>https://community.esri.com/t5/electric-questions/need-help-to-design-connection-at-the-grid/m-p/1305702#M865</link>
      <description>&lt;P&gt;Yes, I need to create subnetwork controller and subnetwork, starting Low terminal&amp;nbsp; of HV transformer to CB bus of MV Circuit Breaker. So &lt;STRONG&gt;which tier&lt;/STRONG&gt; I suppose select if not sub-transmission (contain high voltage devices and MV devices)&amp;nbsp; at sub network definition tool?&amp;nbsp;&lt;/P&gt;</description>
      <pubDate>Wed, 05 Jul 2023 12:24:47 GMT</pubDate>
      <guid>https://community.esri.com/t5/electric-questions/need-help-to-design-connection-at-the-grid/m-p/1305702#M865</guid>
      <dc:creator>RomuldKiobya</dc:creator>
      <dc:date>2023-07-05T12:24:47Z</dc:date>
    </item>
    <item>
      <title>Re: NEED HELP TO DESIGN CONNECTION AT THE GRID SUBSTATION -TIERS  AT THE ELECTRICAL DOMAIN</title>
      <link>https://community.esri.com/t5/electric-questions/need-help-to-design-connection-at-the-grid/m-p/1305708#M866</link>
      <description>&lt;P&gt;Then you would just make the HV to MV transformer a subnetwork controller in the Distribution tier, call it Sub1 or some other name, and keep you the other subnetwork controllers at the circuit breakers in the distribution tier.&lt;/P&gt;</description>
      <pubDate>Wed, 05 Jul 2023 12:37:34 GMT</pubDate>
      <guid>https://community.esri.com/t5/electric-questions/need-help-to-design-connection-at-the-grid/m-p/1305708#M866</guid>
      <dc:creator>JohnAlsup</dc:creator>
      <dc:date>2023-07-05T12:37:34Z</dc:date>
    </item>
  </channel>
</rss>

