<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:rdf="http://www.w3.org/1999/02/22-rdf-syntax-ns#" xmlns:taxo="http://purl.org/rss/1.0/modules/taxonomy/" version="2.0">
  <channel>
    <title>topic 21st Century Infrastructure Project Execution Redefining Phases Utilizing Esri | Kourosh Langari – Caltrans in AEC (Architecture, Engineering and Construction) Videos</title>
    <link>https://community.esri.com/t5/aec-architecture-engineering-and-construction-videos/21st-century-infrastructure-project-execution/m-p/976894#M13</link>
    <description>&lt;div class="lia-vid-container video-embed-center"&gt;&lt;div id="lia-vid-6203085419001w320h240r155" class="lia-video-brightcove-player-container"&gt;&lt;video-js data-video-id="6203085419001" data-account="6161463677001" data-player="default" data-embed="default" class="vjs-fluid" controls="" data-application-id="" style="width: 100%; height: 100%;"&gt;&lt;/video-js&gt;&lt;/div&gt;&lt;script src="https://players.brightcove.net/6161463677001/default_default/index.min.js"&gt;&lt;/script&gt;&lt;script&gt;(function() {  var wrapper = document.getElementById('lia-vid-6203085419001w320h240r155');  var videoEl = wrapper ? wrapper.querySelector('video-js') : null;  if (videoEl) {     if (window.videojs) {       window.videojs(videoEl).ready(function() {         this.on('loadedmetadata', function() {           this.el().querySelectorAll('.vjs-load-progress div[data-start]').forEach(function(bar) {             bar.setAttribute('role', 'presentation');             bar.setAttribute('aria-hidden', 'true');           });         });       });     }  }})();&lt;/script&gt;&lt;a class="video-embed-link" href="https://community.esri.com/t5/video/gallerypage/video-id/6203085419001"&gt;(view in My Videos)&lt;/a&gt;&lt;/div&gt;&lt;BR /&gt;&lt;P&gt;&lt;A href="https://community.esri.com/migrated-users/238331"&gt;Kourosh Langari&lt;/A&gt;‌, with Caltrans, gives an overview of the presentation he recorded for the virtual 2020 Esri User Conference. His presentation will be available to view on-demand, search the conference online agenda with the presentation name.&lt;/P&gt;&lt;P&gt;&lt;/P&gt;&lt;P&gt;Abstract submitted:&lt;/P&gt;&lt;P&gt;In an Integrated Project Delivery (IPD), the project flow from conceptualization through implementation to optimize the project development work flow. California DOT is utilizing IPD work flow, to utilize the emerging technologies such LIDAR point cloud solutions and utilization of Esri ArcGIS Pro Platform to implement Virtual Design Construction (VDC) and can use the Version Manager to create new versions, modify version properties, and delete versions in an enterprise geodatabase.&lt;/P&gt;</description>
    <pubDate>Tue, 07 Jul 2020 01:22:02 GMT</pubDate>
    <dc:creator>LaurenceLitrico</dc:creator>
    <dc:date>2020-07-07T01:22:02Z</dc:date>
    <item>
      <title>21st Century Infrastructure Project Execution Redefining Phases Utilizing Esri | Kourosh Langari – Caltrans</title>
      <link>https://community.esri.com/t5/aec-architecture-engineering-and-construction-videos/21st-century-infrastructure-project-execution/m-p/976894#M13</link>
      <description>&lt;div class="lia-vid-container video-embed-center"&gt;&lt;div id="lia-vid-6203085419001w320h240r171" class="lia-video-brightcove-player-container"&gt;&lt;video-js data-video-id="6203085419001" data-account="6161463677001" data-player="default" data-embed="default" class="vjs-fluid" controls="" data-application-id="" style="width: 100%; height: 100%;"&gt;&lt;/video-js&gt;&lt;/div&gt;&lt;script src="https://players.brightcove.net/6161463677001/default_default/index.min.js"&gt;&lt;/script&gt;&lt;script&gt;(function() {  var wrapper = document.getElementById('lia-vid-6203085419001w320h240r171');  var videoEl = wrapper ? wrapper.querySelector('video-js') : null;  if (videoEl) {     if (window.videojs) {       window.videojs(videoEl).ready(function() {         this.on('loadedmetadata', function() {           this.el().querySelectorAll('.vjs-load-progress div[data-start]').forEach(function(bar) {             bar.setAttribute('role', 'presentation');             bar.setAttribute('aria-hidden', 'true');           });         });       });     }  }})();&lt;/script&gt;&lt;a class="video-embed-link" href="https://community.esri.com/t5/video/gallerypage/video-id/6203085419001"&gt;(view in My Videos)&lt;/a&gt;&lt;/div&gt;&lt;BR /&gt;&lt;P&gt;&lt;A href="https://community.esri.com/migrated-users/238331"&gt;Kourosh Langari&lt;/A&gt;‌, with Caltrans, gives an overview of the presentation he recorded for the virtual 2020 Esri User Conference. His presentation will be available to view on-demand, search the conference online agenda with the presentation name.&lt;/P&gt;&lt;P&gt;&lt;/P&gt;&lt;P&gt;Abstract submitted:&lt;/P&gt;&lt;P&gt;In an Integrated Project Delivery (IPD), the project flow from conceptualization through implementation to optimize the project development work flow. California DOT is utilizing IPD work flow, to utilize the emerging technologies such LIDAR point cloud solutions and utilization of Esri ArcGIS Pro Platform to implement Virtual Design Construction (VDC) and can use the Version Manager to create new versions, modify version properties, and delete versions in an enterprise geodatabase.&lt;/P&gt;</description>
      <pubDate>Tue, 07 Jul 2020 01:22:02 GMT</pubDate>
      <guid>https://community.esri.com/t5/aec-architecture-engineering-and-construction-videos/21st-century-infrastructure-project-execution/m-p/976894#M13</guid>
      <dc:creator>LaurenceLitrico</dc:creator>
      <dc:date>2020-07-07T01:22:02Z</dc:date>
    </item>
  </channel>
</rss>

