I have kind of a weird problem. I have 3 fixed locations which need to conduct ~2000 inspections across an area. Distance and time do not really matter but I need to make sure that all of the inspections are covered. The load would be ideally equally distributed across the 3 locations. I want the network to calculate cost radially out from the 3 locations. Anyone got any ideas? -Adam
... View more