POST
|
I think creating a new table where I can copy-paste everything from each induvidual spreadsheet, so I have them all in one go, and only need to create that one layer for an entire railtrack stretch, might be the way to do this best. It might take 15-20 mins for an entire project which is not that bad to be honest. Thank you for your help in this matter Dan. I am amazed at the speed to which I got these questions answered And thank you as well Pan Gis for hooking me up
... View more
01-04-2018
05:40 AM
|
1
|
0
|
1403
|
POST
|
It is indeed a hassle to work with the table structure from Excell, but unfortunately it is the way the reports are being generated. Perhaps a bit of background info is in order here. I work with rail track drainage. When replacing tracks etc, and new drainage is designed I use reports including information on existing wells, to which I might be able to connect in order to keep the rail track dry. These reports are super handy when importing them of the XY coordinates, since I can just click a point near to the place I'm designing new drainage and get all the relevent information from it. And then be able to model in my CAD tool. But if there is no way to create the layer by forcing it to start looking from row 6, I will have to keep doing it one at a time.
... View more
01-04-2018
05:25 AM
|
0
|
2
|
1403
|
POST
|
I don't need the rows but since the structure of the table is the same for all tables, it would be nice if I could streamline the process so I wouldn't need to manually delete the top 5 rows for each table. And if I could find a way to make the tool only read from row 6 and down I could create the layers from tables located on a server witout having to download each table and modify my own copy each time.
... View more
01-04-2018
03:41 AM
|
0
|
2
|
1403
|
POST
|
Hi all. I'm currently trying to create an XY event layer from an excel table. The table has the top 4 rows merged in which the description of the content is displayed. The fifth row is subheaders, and finally in the 6th row the data is displayed, including the fields with X and Y coordinates. I can't seem to create the layer, without having to delete the first 6 rows from the table, making the X and Y data being displayed from row one. I'm wondering if there is an option to tell ArcGIS that the event layer should only start reading X and Y coordinates from row six, instead of row one. Regards: Jan Holdorff Nielsen
... View more
01-04-2018
01:18 AM
|
0
|
11
|
2555
|
Title | Kudos | Posted |
---|---|---|
1 | 01-04-2018 05:40 AM |
Online Status |
Offline
|
Date Last Visited |
11-11-2020
02:24 AM
|